pzzl0123 发表于 2009-1-17 10:27

105t的t型梁

我这有一片T型梁,50米长,重105吨,想吊在跨度50米的河上,幅度30米左右,该用多大的吊车?请各位前辈指教!

sharon 发表于 2009-1-17 10:39

500T

wang125oohua 发表于 2009-1-17 12:19

回复 1# pzzl0123 的帖子

1200t

麦乔博 发表于 2009-1-17 13:20

500起

黄油工 发表于 2009-1-17 15:15

500吨绝对不行

yiqinsu 发表于 2009-1-17 18:44

用轮船吊

宽容失败 发表于 2009-1-17 18:44

┌─────┐
CC 2500   Capacities on Main Boom with             │ SSL │
            Superlift                              └─────┘            360°
            Capacity (t) = Load + Hook Block
                                                       Counterweight   140 t
                                                       Central ballast    30 t
                                                       Track             7.8 m
            Main Boom      72.0 m   Type 2721

            SL-Mast          30.0 m   Type 2317
            SL-Cwt.-Radius   15.0 m

Radius      SL-Counterweight (t)
(m)
             0.0      60.0       120.0       180.0       230.0
──────────────────────────────────────────────────────────────────────────────
12      177.0*      241.0#         -         -         -
14      138.0*      220.0*      243.0#         -         -
16      112.0       181.0*      242.0#         -         -
18         94.0       152.0*      211.0*      242.0#         -
20         80.0       131.0*      182.0*      226.0*         -

22         69.0       114.0*      160.0*      204.0*      229.0#
24         60.0       101.0       142.0*      183.0*      208.0*
26         53.0      90.0       128.0*      165.0*      191.0*
28         47.0      81.0       116.0*      150.0*      176.0*
30         42.0      74.0       105.0       137.0*      163.0*

34         34.0      61.0      89.0       116.0*      139.0*
38         28.0      52.0      76.0       100.0       121.0*
42         22.0      45.0      66.0      88.0       106.0
46         18.0      39.0      58.0      78.0      94.0
50         15.0      34.0      52.0      70.0      85.0

54         12.0      30.0      46.0      63.0      77.0
58         10.0      26.0      42.0      57.0      70.0
62          8.0      23.0      38.0      52.0      64.0
──────────────────────────────────────────────────────────────────────────────
HE:      #2x 9       #2x 9       #2x 9       #2x 9       #2x 9
         *2x 8       *2x 8       *2x 8       *2x 8       *2x 8
            1x 8      1x 8      1x 8      1x 8      1x 8
──────────────────────────────────────────────────────────────────────────────
DS:      21000159    22000159    23000159    24000159    25000159
──────────────────────────────────────────────────────────────────────────────
HE = no. of hoist lines         # = the hook block does not reach the ground
DS = selecting operating mode                            * = double hook block

In case of runner mounted, you have to reduce the load by the weight of the
runner plus the weight of the hook block on the runner.

If the jib suspension rods are on the main boom, you will have to reduce
the load by the half weight of the rods.

yu51943 发表于 2009-1-17 18:58

两台300汽车吊就OK啦

pzzl0123 发表于 2009-1-17 19:31

回复 7# 宽容失败 的帖子

看你给的幅度表,500T的履带吊干的不是很轻松啊!

宽容失败 发表于 2009-1-17 21:45

原帖由 pzzl0123 于 2009-1-17 19:31 发表 http://www.cranebbs.com/bbs/images/common/back.gif
看你给的幅度表,500T的履带吊干的不是很轻松啊!
这是450吨性能表,挂180吨超起配重,30米半径可吊130吨

heyonghui 发表于 2009-1-17 21:58

笨蛋
用1200的拉
又不是没有

sddzdc 发表于 2009-1-18 08:37

500T履带挂超起绝对没有问题·!

caixuedong 发表于 2009-1-18 09:30

宽容失败的车子干着比较轻松的啊   ;P

pzzl0123 发表于 2009-1-18 14:38

谢谢各位!。我知道了!

捡‰破烂 发表于 2009-2-23 22:22

架桥机

8吨吊车 发表于 2009-3-31 16:01

建议你用个大点的 我觉得500T不行 跨度太大

:)

526526 发表于 2009-3-31 23:52

500的?准备掉河里吧。个人意见,最好两车抬,安全!

zhh801221 发表于 2009-4-12 23:51

你这活应该是两台吊车干的,一般大型桥梁一个车去吊的少,只有在条件允许的情况下。

mytx 发表于 2009-4-24 18:18

个人认为你还是找两台车抬吧!一跨度大 二桥梁太长
页: [1]
查看完整版本: 105t的t型梁